- Water Tank Construction
- Water Tank Construction for Off Road Trucks
- Standard Components (Air System)
- Tank Installation
-
All holes for piping through tank are plasma cut for precise fit allowing for uniform welds
-
Pulse welding allows us to get 100% penetration at a lower temperature which causes less flexing of the steel
-
Tanks is welded inside out
-
All welds are continues with not spot welding
-
Tanks are installed and tested at our facility in Plant City, FL
- 5,000 & 6,000 Gallon Tank: Top, sides & end plates 1/4” A36 Steel Plate
- 7,000 & 8,000 Gallon Tank Top & Side 1/4” A36 Plate End Plates 3/8” A36 Steel Plate
- 7,000 & 8,000 Gallon Tank 4” Channel Stiffeners On Front End Plate For Added Strength
- All Tanks Bottom Plate 1/2” A36 Steel Plate
- (1) 1/4” A36 Steel Plate Baffles Run Full Length Of Tank
- (2) 1/4” A36 Steel Plate Baffles Spaced Evenly Through Tank Creating (4) Separate Department For Precise Water Flow Through All (4) Compartments
- Fenders Are Integrated Into The Tank For Strength
- 3” Anti Syphon Fill Pipe At Ground Level For Filling
- 24” Square Man Hole For Filling & Tank Entry For Inspection
- Steps Mounted On Front Of Tank To Access Top Of Tank
- Full Lighting Package Mounted On Rear Of Tank
- 3 Front Spray Heads Independently Operated
- 4 Front Spray Heads Independently Operated
- 4 X 3 Hydraulically Operated Water Pump
- Stang U.S. Made Electric Remote Operated Cannon
- 50’ Hose Reel On Rear Of Tank
- In-Cab Operator Station With Controls For All Functions Including Joy Stick Control For Cannon
- Tank Is Installed Directly To Frame For the Lowest Possible Center Of Gravity
- Mounting Points On Front And Rear Of Tank To Prevent Side To Side Movement & Front to Rear Movement
- 1/4” Rubber Pad Installed Between Tank And Chassis Frame For Cushioning